How To Replace Kitchen Cupboards: A Step-by-Step Guide

Yes, you can replace your kitchen cupboards yourself; this project, often called replacing kitchen cabinets DIY, is achievable for homeowners with basic tool skills and patience. This guide will walk you through every step of how to replace kitchen cupboards, from taking out the old ones to making the new ones fit perfectly.

Preparation: Planning Your New Kitchen Layout

Good planning stops big problems later. Before you touch a single screw, you need a solid plan. This stage sets the foundation for successful kitchen cabinet installation.

Measuring Your Space Accurately

Measure twice, buy once. Get the size of your kitchen right.

  • Measure the length of every wall where cabinets will go.
  • Note the height from the floor to the ceiling.
  • Mark the exact spots for sinks, windows, and doors.
  • Check the distance from the floor to the bottom of any upper cabinets (this is usually 18 inches above the counter).

Choosing Your New Cabinets

Cabinets come in three main types:

  1. Stock Cabinets: Ready-made sizes. Cheapest and fastest.
  2. Semi-Custom Cabinets: Allow some changes to depth or size. A good middle ground.
  3. Custom Cabinets: Built just for your space. Most expensive but offer the best fit.

If you are upgrading kitchen cabinets, consider the style and function you want. Do you need more storage? Better drawer slides?

Gathering Necessary Tools and Supplies

You will need a good set of tools for this job.

Tool Category Essential Items Notes
Safety Safety glasses, gloves Always protect your eyes.
Measuring & Marking Tape measure, level (4-foot is best), chalk line, pencil Accuracy is key here.
Dismantling Pry bar, hammer, utility knife, screwdriver set For removing old kitchen cabinets.
Installation Power drill/driver, bits, clamps, shims, cabinet screws Specialized cabinet screws are best.
Finishing Caulk gun, wood filler, touch-up paint For small fixes and sealing gaps.

Phase One: Safely Removing Old Kitchen Cabinets

The first big step is getting the old units out. This process, kitchen cabinet removal tips focus on safety and preserving the walls where possible.

Shutting Off Utilities

Safety first! This is vital before you start work near sinks or plumbing.

  • Water: Turn off the main water supply or the shut-off valves under the sink. Drain the lines by opening the faucet.
  • Electricity: Turn off the power to the outlets and lights near the workspace at the main breaker box. Test the wires with a non-contact voltage tester to be certain.

Detaching Countertops and Backsplashes

Countertops usually sit on top of the base cabinets.

  1. Remove the Sink and Faucet: Disconnect the drain lines and water lines. Lift the sink out if possible.
  2. Separate the Countertop: Look under the counter. Screws often hold the top to the base cabinets. Remove these. If the counter is glued down (especially laminate), you might need a stiff putty knife or chisel to gently separate the seam between the counter and the cabinet frame. Be careful not to damage the wall behind it.
  3. Remove the Backsplash: If the backsplash is tile, you may need a hammer and chisel to carefully break it away. If it’s just wood paneling, unscrew it.

Taking Out the Cabinets

This is where kitchen cabinet removal tips are important. Always work top to bottom.

Upper Cabinets:

  1. Find Mounting Screws: Look inside the cabinets, usually near the top and bottom plates, where they attach to wall studs. Often, they are screwed through the cabinet frame directly into the wall studs.
  2. Unscrew: Use a drill to remove these screws. Have a helper hold the cabinet, as they can be heavy.
  3. Gently Pull Away: Once all screws are out, gently pull the cabinet away from the wall. If it feels stuck, check for hidden nails or glue.

Base Cabinets:

  1. Remove Shelves and Doors: Take everything out to make them lighter.
  2. Locate Mounting Points: Base cabinets are usually fastened to the wall studs and sometimes anchored to the floor.
  3. Unscrew: Remove the screws connecting the cabinet back to the wall studs.
  4. Remove Toe Kicks (if applicable): Some base units have a removable panel at the bottom front (the toe kick). Take this off to access floor anchors if needed.
  5. Lift Out: Pull the cabinet away from the wall. You may need to use a pry bar under the bottom edge to break any floor adhesion.

Phase Two: Preparing the Space for New Cabinets

Once the debris is cleared, you must prepare the walls and floor for the installing new kitchen units.

Inspecting and Repairing Walls

Check for water damage or missing drywall where the old cabinets were.

  • Patch any holes or damage.
  • Let the patching compound dry completely.

Locating Studs and Marking Layout Lines

Accurate layout lines are the secret to perfect kitchen cabinet installation.

  1. Find Stud Centers: Use a stud finder to locate every wall stud where the cabinets will sit. Mark the center line of each stud clearly with a pencil.
  2. Establish the Level Line: Use your 4-foot level or a laser level to draw a perfectly straight, horizontal line around the room. This line marks where the bottom of your upper cabinets and the top of your base cabinets will sit. For base cabinets, this line usually represents the top of the countertop height (usually 34.5 inches from the subfloor).

Pro Tip: It is easier to shim a base cabinet that is slightly too low than one that is already too high. Mark your line slightly lower than the final desired height to give yourself room for shimming up.

Phase Three: The Kitchen Cabinet Installation Process

This is the core of replacing kitchen cabinets DIY. Work methodically, starting with the base cabinets, then the wall cabinets.

Installing Base Cabinets

Base cabinets must be perfectly level and plumb (straight up and down).

1. Setting the First Cabinet (The Anchor)

Always start with the corner cabinet or the cabinet next to the sink location. This cabinet dictates where everything else goes.

  • Placement: Hold the cabinet against the wall, resting on the floor.
  • Shimming: Place wood shims between the cabinet bottom and the floor, or between the back of the cabinet and the wall, until it is perfectly level side-to-side and front-to-back. Use small wedges of wood (shims) to adjust height.
  • Securing: Drill pilot holes through the cabinet frame and into the wall studs marked earlier. Use long cabinet screws (2.5 to 3 inches) to fasten the cabinet securely. Do not overtighten; this can warp the frame.
2. Installing Adjacent Base Cabinets

Once the first cabinet is rock solid, the rest follow quickly.

  • Positioning: Place the next base cabinet snugly against the first one. Use bar clamps to pull the two cabinet faces flush together tightly.
  • Level Check: Check both cabinets with your level. Adjust shims as necessary.
  • Joining Cabinets: Drill pilot holes and drive screws through the side frames where the cabinets meet. Space these screws every 8 to 12 inches. This connects them into one solid unit.

Table: Base Cabinet Installation Sequence

Step Focus Area Critical Check
1 Corner Cabinet Level and Plumb
2 Next Cabinet Clamped Tightly, No Gaps
3 All Units Securely Screwed to Wall Studs
4 Final Check Confirm all units are level across the run

Installing Upper (Wall) Cabinets

Upper cabinets require more muscle and careful handling. It is strongly recommended to have two people for this part of kitchen cupboard installation guide.

1. Marking for Upper Cabinets

Use your initial layout line (from Phase Two). This line represents the bottom edge of your upper cabinets.

2. Hanging the First Upper Cabinet

Work from the corner out, just like the base cabinets.

  • Support: You can use temporary supports like sawhorses or a ledger board (a strip of wood screwed temporarily to the wall studs just below your level line) to help hold the weight while you secure it.
  • Attaching to Wall: Have one person hold the cabinet steady while the other drills pilot holes through the upper cabinet frame into the wall studs.
  • Securing: Use long cabinet screws to attach the cabinet. Make sure it sits flush against the wall and is plumb.
3. Joining Upper Cabinets Together

Once the first upper cabinet is secure, connect the next one.

  • Clamping: Clamp the cabinets tightly together at the front and back edges.
  • Fastening: Drill and drive screws through the side panels to connect them securely, just as you did with the base units.
4. Dealing with Uneven Walls

If your wall is slightly bowed or uneven, you might see a gap behind the cabinet. This is where shims are essential for cabinet mounting techniques. Place shims behind the cabinet back before screwing it in place, ensuring the cabinet face remains plumb and level, even if the wall behind it is not perfectly flat.

Phase Four: Final Touches and Enhancements

Once the frames are up, you can focus on aesthetics and function. This stage covers upgrading kitchen cabinets beyond simple replacement.

Installing Cabinet Doors and Drawer Fronts

If you bought pre-assembled boxes, you just need to attach the doors and drawer fronts.

  1. Hanger Placement: Most modern cabinets use European-style concealed hinges. Screw the hinge base plates to the inside of the cabinet frame first, according to the manufacturer’s instructions.
  2. Attaching Doors: Attach the hinge arms to the doors. Then, snap the doors onto the base plates.
  3. Adjustment: Hinges are highly adjustable. You can move doors up, down, left, right, and in or out until all the gaps between doors and drawers are even. This fine-tuning is crucial for a professional look.

Installing Hardware

If you are refacing kitchen cabinets or installing new ones, new hardware makes a huge difference. This step covers kitchen cabinet hardware replacement.

  • Drilling for Handles/Knobs: Use a template if provided by the hardware manufacturer. Measure carefully to ensure all knobs and pulls line up perfectly across all doors and drawers. Drill slowly to avoid splitting the wood.
  • Attachment: Screw the hardware firmly into place from the inside of the door or drawer.

Installing the Countertops (If Applicable)

If you removed the old counters, install the new ones now. This often requires professional help depending on the material (granite, quartz, etc.).

  • Base Cabinets Ready: Ensure the top edges of all base cabinets are level and ready to support the counter weight.
  • Securing: Countertops are usually secured from underneath by screwing up into the countertop through the cabinet frame, or by using specialized clips.

Final Adjustments and Clean Up

Go over every door and drawer one last time. Ensure they open smoothly and close tightly.

  • Caulking: Apply a bead of silicone caulk where the backsplash meets the counter and where the cabinets meet the wall, especially in wet areas like around the sink. This prevents moisture intrusion.
  • Toe Kicks: Install the decorative toe kicks (the recessed area at the bottom front of base cabinets).
  • Utility Reconnection: Reconnect the sink plumbing and turn the water and electricity back on, checking for leaks or shorts.

Addressing Common Scenarios

Sometimes, the replacement isn’t a full tear-out. Refacing kitchen cabinets is a popular alternative.

What is Refacing Kitchen Cabinets?

Refacing involves keeping the existing cabinet boxes but replacing the visible, external parts: doors, drawer fronts, and the cabinet faces (visible wood around the frame). This is faster and cheaper than a full replacement.

Process for Refacing:

  1. Removing Old Doors/Drawers: Carefully remove all doors and drawer fronts. Keep the boxes intact.
  2. Surface Preparation: Clean and lightly sand the exposed cabinet boxes.
  3. Applying Veneer/Laminate: Apply new, high-quality laminate or wood veneer directly onto the existing cabinet frames.
  4. Installing New Doors: Install the new doors and drawer fronts onto the existing boxes using new hinges.

This method significantly reduces the work involved in removing old kitchen cabinets and saves time on the major framing work.

Frequently Asked Questions (FAQ)

Q: How long does it take to replace kitchen cabinets DIY?
A: For a typical small to medium kitchen, removing the old units takes one full day. Installing new kitchen units (base and upper) usually takes 1 to 3 days, depending on the complexity and whether you are installing complex drawers or custom features. Allow an extra day for countertop installation if you are doing that yourself.

Q: Can I install cabinets myself if my floor isn’t level?
A: Yes, but it requires careful use of shims. When replacing kitchen cabinets DIY, you level the cabinet using shims under the base, making the cabinet itself level and plumb. You are not trying to make the floor level; you are adjusting the cabinet to sit perfectly level on top of the uneven floor.

Q: What is the easiest way to connect upper cabinets?
A: The easiest method involves using strong clamps to hold the two units flush side-by-side before drilling pilot holes and driving screws through the face frames or side panels. This ensures a seamless look where the cabinets meet. This is a key cabinet mounting techniques detail.

Q: Do I need to replace the kitchen cabinet hardware replacement if I keep the old boxes?
A: While optional, replacing hardware is highly recommended when upgrading kitchen cabinets or refacing. New hardware instantly modernizes the look and often provides better functionality than old pulls.

Leave a Comment